Mr Tony Day - Newquay
The team began by leveling out the earth on both sides of a rear garden patio before laying 35mm Pebble Beach to a 90m2 area. A sleeper step was also installed as part of the project.
“What a difference the artificial grass has made to the space, which is now far more practical. A real team effort.”